Aquamain Water Utility Contractors & Certified Self-Lay Provider linear logo

Southern Water Developer Services

Southern Water logo to represent Aquamain Developer Services for Southern Water region

In Partnership with Southern Water Developer Services

Southern Water supply 532 million litres of water a day to 2.5 million customers across East Kent, specific parts of Sussex, Hampshire and the Isle of Wight.

We work with across their region to assist property developers and housebuilders with new water supply, new water connections and pipework installation requirements.

Working in partnership with Southern Water Developer Services, we help you during the early stages of your development and advise on your options with regards to planning through to final connections.

We harness our existing relationships with the developer services group to help you navigate planning requirements and advise you on what processes and applications are needed to work with Southern Water end to end.

Aylesford Maidstone Kent and the R

Southern Water Approved Contractors

Developer Services for Southern Water region

Working with a regional water board can be tricky and timely as you will need to engage with a variety of services throughout the build process.

Aquamain have been working with Southern Water since 2014 and are proud to be an accredited SLP for Southern Water. This means we are an approved contractor who will deliver the same level of water services you can expect from your incumbent water board.

We ensure all projects meet the regional water board standards and stay up to date with the latest news on capacity requirements and timings so that we can guarantee quality, cost control and deliver to our promised schedules.

During the early planning stages, we can support you with your water infrastructure and advise you on the specific services we offer and why these may be quicker and more cost effective than working with Southern Water independently and directly.

Water Mains Installation

Our fully trained staff can install water mains in various sizes and materials according to local conditions and regional water company specifications. The Aquamain field teams are fully trained to install all sizes of main in all forms of Polyethylene (PE) or Barrier pipe (BP) where we are familiar with both Protectaline and Puriton products.

Every pipe weld is uniquely identified, monitored and recorded via our ‘Control Point‘ cloud-based monitoring and assurance system. The quality of each joint is subject to a pass/fail test at the time of fusion.

By using Aquamain, we can offer a cost effective and flexible alternative to the incumbent regional water companies as well as other less established SLPs.

As a leading Self Lay Provider (SLP) we are solely focused on serving you the developer. It’s what we do. Our support functions and management structure are geared to support the way you operate your business. Our lead-in and response times are operated around your needs.

We work closely and maintain strong and professional relationships with the incumbent regional water companies. We have a deep understanding of the regulated nature and environment of the water companies and the complex processes around the provision of water. We navigate those requirements so that you get the asset you need, when you need it

Southern Water New Water Supply and Connections

Water infrastructure and water asset management requires extensive planning for new build developments. We know just how important it is for everything to be coordinated around the bespoke needs of your construction programme. Water mains solutions need to be meticulously detailed to ensure they continue to deliver to the exact needs of Southern Water across their region.

We work closely with you and adopt a partnership approach with Southern Water, notifying them at key stages to allow us to plan and manage your unique water mains requirements.

This enables us to advise you on the different options that are available to you from Sothern Water requisition, Self-lay, or New Appointment and Variations (NAV)).

We can often deliver water utility projects much faster, provide greater flexibility and streamline communications with one expert point of contact who works with the relevant teams and touchpoints across Southern Water.

Southern Water New Connection Application

Because of our unique relationship with Southern Water and their developer services team we are familiar with the processes required to carry out works across their water region.

Southern Water have created a specific online portal which is dedicated to supporting water supply and water connection services for large commercial developments as well as residential services for new house builds or extensions.

New water connection applications

Southern Water Case Study

Contrary to popular belief, Lorem Ipsum is not simply random text. It has roots in a piece of classical Latin literature from 45 BC, making it over 2000 years old. Richard McClintock, a Latin professor at Hampden-Sydney College in Virginia, looked up one of the more obscure Latin words, consectetur, from a Lorem Ipsum passage, and going through the cites of the word in classical literature, discovered the undoubtable source. Lorem Ipsum comes from sections 1.10.32 and 1.10.33 of "de Finibus Bonorum et Malorum" (The Extremes of Good and Evil) by Cicero, written in 45 BC. This book is a treatise on the theory of ethics, very popular during the Renaissance. The first line of Lorem Ipsum, "Lorem ipsum dolor sit amet..", comes from a line in section 1.10.32.

The standard chunk of Lorem Ipsum used since the 1500s is reproduced below for those interested. Sections 1.10.32 and 1.10.33 from "de Finibus Bonorum et Malorum" by Cicero are also reproduced in their exact original form, accompanied by English versions from the 1914 translation by H. Rackham.

Family happy to have chosen southern water approved contractors

'Just as we do for installation activities, we take a no compromise approach to all our commissioning processes'. 

Flexible copy component for case study and/or water board guides
Add case study facts/snippets for recent Thames Water project and option to download or link to full case study – more info needed

Download Case Study

Southern Water Build Over

Flexible component that can be added for build over targeting (if relevant).

Whilst we don't have any idea what this content will be, we will wait until we know more. We can design a new section if required after having a chat/ content is supplied. Cool for cats!

This Link is Magic

SLP Services for Southern Water

Aquamain are a WIRS accredited self-lay organisation which means we have been approved to supply new water connections and associated water utility services on behalf of Southern Water.

Whether you need advice, a quotation, help or you just want to talk with someone about the provision of water assets for your development, the Aquamain team are here to help you – contact us today.

ISO 14001 logo
Water Industry Registration Scheme logo
ISO 9001 logo
Aquamain (UK) Limited
Company No: 05248553
VAT Number: GB 291813588
© 2022 Aquamain (UK) Limited - all rights reserved | design by 
Lanx World
envelopephone-handsetmap-markerchevron-downmenu-circlecross-circle