Before any new network is brought into supply or energised, it must be tested and commissioned to the standard required for adoption. Aquamain carries out testing and commissioning of water and electricity networks, giving developers and network operators the assurance that assets are safe, compliant and ready to adopt.
We also offer pressure testing services for non-potable installations such as PE riser mains.
Water commissioning, step by step
Potable and non-potable pipe commissioning for both plastic and metal pipework:
The pipe is swabbed through to clear any debris left behind from installation.
The new main is pressure-tested to confirm it holds and is free of leaks before it goes into supply.
The main is chlorinated and disinfected so it is safe to carry potable water.
Water samples are taken and tested to confirm the main meets the quality standard required for adoption.

Bringing LV & HV networks into service
LV & HV fault-finding
Locating and diagnosing faults on low- and high-voltage cables.
Cable testing
Insulation and pressure testing of LV and HV cables prior to energisation.
Energisations
Safely bringing new networks into supply.
Substation commissioning
Commissioning packaged substations ready for service.
Network operations
Switching and operational support on live networks.